Ostrava Concert Hall

TCC Services

Program verification, theatre planning, auditorium design, and theatre equipment design and overview, i.e. performance lighting, architectural lighting control, stage machinery, theatrical and acoustical drapery, and audience seating systems

Location

Ostrava, Czech Republic

Architect

Steven Holl Architects (Design Architect);
Architecture Acts (Architect of Record)

Acoustician

Nagata Acoustics

Cost

$69 million (est.)

Completion

2024

Renderings

Steven Holl Architects

Ostrava Concert Hall

This competition-winning design for Ostrava’s new concert hall will cantilever over the 1960s modernist House of Culture and provide a grand performance space for the Janáček Philharmonic Orchestra. The concept of a ‘perfect acoustic instrument in its case’ proposes a 1,300-seat zinc-clad concert hall with a ‘vineyard style’ seating arrangement.

DOWNLOAD PDF